GLI GLI Quality Tool
GLI Quality Tool — Version 2.0

Designing a preventive action form for TB laboratories

A preventive action form gives a tuberculosis laboratory a structured way to act on a risk before it becomes an exposure, near miss or service disruption. It records what could happen, who might be affected, which controls are required, who owns each task and how leaders verify that the action worked. The form is not an incident report. It is a planned, evidence-based control within the laboratory safety and continual improvement elements of a quality management system.

Useful forms fit the way work is actually done. A technologist, scientist or safety representative should be able to complete one without creating a duplicate risk register, and the result should link to induction records, equipment maintenance, deviation logs and management review minutes. The design must also reflect Australian conditions: public and private laboratories may operate from major city hospitals in Melbourne or Sydney, regional health services or smaller contracted facilities, with sharply different staffing, infrastructure and supply arrangements.

The GLI Quality Tool provides a four-phase roadmap supported by twelve Quality Systems Essentials, practical checklists and guidance for laboratories with limited resources. A preventive action form can sit within that roadmap as the bridge between identifying a foreseeable hazard and proving that preventive controls were implemented. Its value depends on clear ownership, realistic deadlines, retained evidence and a built-in review; a polished template without those features will quickly become unused paperwork.

Begin with a task, not a vague concern

Open the current risk assessment and select one foreseeable failure associated with a defined task, such as processing sputum, moving specimens, maintaining airflow equipment or managing an equipment outage. Describe the hazard, the exposure pathway, the people who could be affected and the consequence. This prevents broad entries such as “poor safety culture” or “unsafe laboratory practice,” which are difficult to control or verify.

Record the proposed intervention before assigning a deadline. An action might involve installing splash guards, changing specimen transport routes, scheduling fit testing, adjusting batch sizes or arranging alternative testing during maintenance. Where a control cannot be implemented immediately, document the interim measure and the risk remaining during that period. The GLI phase 4 resources provide useful context for strengthening continual improvement once the laboratory has established the basic management of safety, equipment and documentation.

Define fields that make early action accountable

A useful form should capture the risk source, affected task, existing controls, likelihood, severity and initial risk rating. It should also provide space for the proposed control, responsible person, due date, required resources, completion evidence and effectiveness check. Use plain-language prompts and mandatory fields for ownership and due dates. Optional fields that nobody completes should be removed because they add length without improving risk control.

Each preventive measure should have one accountable owner even when several people contribute. State what will be done, rather than “monitor” or “improve.” Good evidence might include a purchase order, revised work instruction, training record, maintenance certificate, photograph or signed checklist. Near misses and staff observations can trigger review of a preventive action, but they should not be converted into incident reports merely to complete the form.

A specific example might involve specimen overflow increasing processing time and rushed specimen handling. The action could require additional overflow containers, a defined maximum batch size, scheduled cleaning and escalation when storage capacity approaches its limit. Another entry might address a required cabinet airflow alarm by defining who checks the alert, who authorises downtime and what alternative workflow applies. These entries create testable controls rather than reminders to “be careful.”

Build controls around Australian laboratory realities

Australian duties must reflect the Commonwealth Work Health and Safety Act 2011 where it applies, the relevant state or territory work health and safety law and applicable Safe Work Australia codes. Laboratory risk controls should also be checked against the current AS/NZS 2243 laboratory biosafety standards. If the form records staff identifiers, health information or competency evidence, managers should apply the Privacy Act 1988 and applicable state privacy legislation, restrict access by role and define record retention.

Built and environmental conditions differ across Australia. Melbourne laboratories may face hot, dry summer days, while Sydney facilities can experience high humidity and air-conditioning loads. Bushfire smoke can interrupt outdoor maintenance or affect building ventilation in regional NSW and other areas. Controls should therefore include pressure differential and airflow monitoring where required, defined responses to ventilation alarms and contingency arrangements that do not depend on technicians travelling long distances during a closure.

Everyday laboratory habits also matter. Australian staff commonly move between clinical benches and TB processing areas during a shift, while phones, notebooks, shared printers and tea-room routines can connect controlled and uncontrolled spaces. Preventive actions should reflect the observed workflow rather than an idealised one. Simple measures such as physically separated phone storage, clear door routines and defined cleaning boundaries can address risks that are otherwise treated as minor housekeeping issues.

Local procurement conditions require equal attention. Australian laboratories may source respirators, gloves and fit-testing services through medical wholesalers or specialist suppliers, and imported items may have longer lead times than local stock. Record minimum stock levels, supplier lead times and approved alternatives. If PPE availability threatens a control, the action should address procurement immediately rather than waiting for a near miss to prompt a response.

Make the form easy to use at the bench

Design the document around the moment a risk becomes apparent. A staff member should be able to open a paper sheet or approved digital form, identify the related risk assessment and enter a concise description without first navigating several registers. Use one action record per risk, consistent date formats, check boxes for recurring checks and a dedicated field for attachments or supporting evidence. Keep the layout suitable for an A4 sheet and for viewing on a laboratory computer or tablet.

Routine users should be able to draft an entry, while a designated supervisor approves high-risk changes and confirms completion. This avoids making the form dependent on a safety committee that may meet infrequently. Provide brief instructions, but also train staff through departmental induction and scenario-based discussions. A worked example showing a weak entry and a well-controlled version is often more effective than a long explanation of scoring terminology.

Link prevention to the quality management system

External assessment depends on evidence that controls operate consistently, not merely that a form exists. The WHO accreditation guide explains how the GLI Quality Tool can support preparation and improvement across laboratory functions. Preventive action records can demonstrate how identified risks feed into corrective action, competency assessment, equipment management and management review without replacing the broader system.

Give each entry a unique identifier and cross-reference the relevant risk assessment, SOP, deviation or equipment record. This creates traceability from the source of risk to completed control and subsequent verification. When the preventive action fails or produces an unexpected result, staff should know whether to open a deviation, an incident report or both. Keeping those pathways distinct preserves the preventive focus while ensuring that actual events receive the investigation required by the quality system.

Pilot, measure and refine

Templates and supporting documents can be adapted from the downloadable materials, then checked against the laboratory’s own workflows and staffing model. Pilot the form on two or three genuine hazards, including one equipment issue and one staffing or supply issue. Ask the people completing the form whether they can identify the trigger, obtain approval, find evidence and close the action without additional assistance.

Measure practical performance rather than the number of forms submitted. Useful indicators include the proportion completed before the next risk review, overdue preventive actions, time from risk identification to control, and corrective actions arising from ineffective controls. Review these indicators with laboratory staff, safety representatives and managers. A low number of entries may mean that risks are genuinely well controlled, but it may also indicate that the form is difficult to find or does not match everyday work.

Schedule formal review at defined intervals and whenever a process, equipment, building service or regulation changes. Repeated late completion, inconsistent ownership or evidence that cannot be verified should lead to redesign of the form or the underlying process. Keep completed forms under version control, retain superseded versions and document who authorised changes. This prevents staff from following different procedures after the form has been updated.

Make prevention part of every workday

Leaders establish the conditions for preventive action by reviewing overdue items, asking whether controls were effective and allocating time and resources. Staff contribute practical knowledge from daily work, including near misses, informal observations and changes in specimen flow. The purpose is not to produce more documentation, but to intervene early enough to protect people, specimens, results and continuity of testing.

Start today by selecting one foreseeable laboratory risk, opening the relevant risk assessment and recording a preventive control on the form. Assign an accountable owner, set a realistic due date and identify the evidence required for closure. Review that entry at the next management meeting, verify whether the hazard was reduced and carry any unresolved action forward with clear accountability.