A Practical Weekly Equipment Check Job Aid for TB Laboratories

A weekly equipment check job aid gives tuberculosis laboratory staff a clear, repeatable way to confirm that instruments, safety systems and supporting equipment are ready for work. It turns routine quality assurance into a short sequence that can be completed during a normal shift, recorded consistently and reviewed when something falls outside the expected range.

For Australian laboratories, the tool should work in a metropolitan public pathology service as well as a smaller facility supporting remote communities. A laboratory in Darwin, Alice Springs or regional Western Australia may face different transport times, staffing arrangements and maintenance access from a service in Melbourne or Sydney. The job aid therefore needs to be practical, easy to adapt and aligned with the laboratory’s own procedures, manufacturer instructions and accreditation expectations.

Design the Aid Around the Work

Start by identifying what staff actually need to check each week. The list might cover a biosafety cabinet, centrifuge, microscope, incubator, refrigerator, freezer, autoclave, temperature monitoring system and backup power arrangements. Include associated items such as alarms, door seals, cables, emergency stops, data loggers and cleaning supplies when their condition affects testing or safety.

The document should be usable at the bench, not read like a lengthy policy. Give it a clear title, the equipment covered, the person responsible, the frequency and the action required when a check fails. Use plain verbs such as inspect, clean, test, record and report. A tick box can show that a check was completed, but it should sit beside space for a value, observation or corrective action where evidence is needed.

Use the same terms that appear in local laboratory documents. Australian services commonly refer to work health and safety, or WHS, rather than occupational health and safety. If the facility uses a state or territory electronic quality system, the paper or digital job aid should point staff to the correct incident, maintenance or non-conformance record.

Define Checks and Acceptance Criteria

Every line on the checklist should answer three questions: what is being checked, what result is acceptable and what happens if the result is not acceptable. “Check the refrigerator” is too vague. “Confirm the display is within the approved range, review the independent temperature log and verify that the alarm is operational” gives staff a measurable task.

Acceptance limits must come from validated methods, equipment manuals, risk assessments and approved standard operating procedures. For example, a refrigerator may have a locally approved operating range, while a centrifuge check may involve visible damage, rotor condition, unusual noise and the availability of a current service label. A biosafety cabinet check may include airflow status, sash position, alarm condition and evidence that the work zone is free from clutter.

Avoid asking staff to perform technical calibration that they are not authorised or trained to complete. A weekly check is usually a visual, functional or record-based verification; calibration and preventive maintenance may occur on a different schedule. Make that distinction explicit so that a tick on the weekly form is not mistaken for evidence that an instrument remains calibrated.

Useful checks for a weekly equipment review include:

Build a Routine Staff Can Follow

Place the checks at a predictable point in the week, such as the first day shift or the first working day after a weekend. A designated staff member can complete the inspection, while a second person reviews exceptions or signs off higher-risk equipment. In a small regional service, one person may hold both roles, but the record should still show who performed the check and who authorised any follow-up.

Organise the aid in the order staff move through the room. They might begin with general safety, then check powered equipment, cold storage, containment equipment and records. This reduces backtracking and makes it easier to notice a problem such as a blocked vent, a leaking seal or an instrument left in an unsafe state.

The sequence should include a simple stop rule. If a centrifuge has a cracked rotor, a freezer is warming beyond its approved limit or a biosafety cabinet alarm is active, staff should stop using the equipment, label it clearly, notify the responsible person and follow the relevant contingency procedure. The job aid should never encourage staff to keep testing patient or reference material on questionable equipment.

A practical workflow can be written as:

Record Results and Escalate Problems

A useful record captures enough information to reconstruct what happened. Include the date, time, equipment identification number, result, reading where relevant, staff initials and comments. For a failed check, record the immediate control, the person notified, the service request or incident number and the date the item was returned to use.

Do not rely on a tick box for a result that can drift over time. Temperature values, alarm tests and visible faults should be written down or entered into the approved electronic system. If electronic records are used, the job aid can include the location of the form and instructions for dealing with system outages.

Set escalation levels in advance. A minor issue, such as a missing cleaning label, may be corrected during the shift. A repeated temperature excursion or overdue service may require the section lead, quality manager or biomedical engineering team. A safety-critical failure should be escalated immediately according to the laboratory’s WHS and incident procedures.

The completed checklist is also evidence for trend review. Repeated failures can reveal a training gap, an unreliable power supply, poor room conditions or a procurement issue. In an Australian public health service, maintenance may involve a central engineering department or an external contractor, so the record should make ownership and response times visible rather than leaving the matter in an informal email trail.

Review, Trial and Improve the Aid

Before releasing the job aid, test it with the staff who will use it. Ask a scientist, technician or laboratory assistant to complete the check during a normal busy period, then observe where instructions are unclear or where a required result cannot be recorded. A short pilot often reveals practical problems, such as a missing equipment number, a checklist that does not fit on a clipboard or a test that requires access to a log kept in another room.

Review the document against the laboratory’s quality management system and the relevant Quality Systems Essentials. It should connect with equipment management, personnel competency, documents and records, assessment, non-conforming work, facilities and safety. The GLI Quality Tool’s guidance on a quarterly review guide can help the team use weekly results as evidence during broader management review rather than treating each checklist as an isolated task.

Keep version control visible. State the document number, effective date, review date and approving role. When an instrument is replaced, a method changes or an incident identifies a missed control, revise the checklist and brief affected staff. A job aid should evolve with the laboratory, while older completed records remain protected according to the service’s document retention rules.

A peer review can also test whether different staff interpret the instructions consistently. The laboratory may compare completed forms, watch staff use the aid and discuss disagreements about pass or fail decisions. The peer review guidance offers a useful model for examining consistency across procedures and identifying wording that needs clarification.

The final version should be short enough to use every week but specific enough to support safe decisions. Store it where staff work, provide a controlled electronic copy if required, and include it in induction and competency activities. In a busy service, a well-designed aid can prevent a forgotten alarm test or overdue maintenance check from becoming a test-quality problem.

Have the laboratory quality lead work with equipment owners and frontline staff to draft the first version, pilot it for several weeks and review the findings at the next quality meeting. Once approved, place the controlled job aid beside the relevant equipment and make the weekly check part of normal TB laboratory practice.